Contact

Graduate School of Design
48 Quincy Street
Gund Hall
Cambridge, MA 02138

Building Services

Projects for Academic Year 2008

Gund Hall

Room 111

During Christmas Break (December 2007 - January 2008) new seating was installed in room 111. New AV equipment, carpeting and light switches have also been added.

Before the renovation:

After the renovation:

 

New Laser Cutting Equipment

A new laser cutter was installed in the 5th floor of the studio area.
The purchase of additional laser cutters is under consideration.

 

7 Sumner Rd.

Life Safety Systems

There was a state of the art upgrade to the Life Safety Systems including:
- Smoke detectors
- Pull stations
- Audio visual devices
- Emergency Lighting

Security Cameras

In response to security concerns, a number of cameras have been installed at the Graduate School of Design.

 

 

Project Director: Kevin Cahill